A database migration is one of the few changes in a codebase that's genuinely hard to fully reverse once applied to production data. That irreversibility deserves its own spec discipline.

Spec-Driven Database Migrations

Most code changes are cleanly reversible — revert the commit, redeploy. A database migration that’s run against production data is only cleanly reversible in the easy cases (adding a nullable column); the moment it involves data transformation, backfill, or a column drop, “revert” stops meaning “undo” and starts meaning “write and run a second migration, carefully, hoping the first one didn’t lose information the second can’t recover.” This asymmetry deserves its own spec discipline, distinct from application-code changes.

What a Migration Spec Needs to Address

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
## Migration: Add `refund_status` column to `orders`

### Schema Change
[The actual DDL, or a description of it]

### Backfill Strategy
- [ ] Existing rows: how is the new column populated for data that
      already exists? Default value, computed from existing data, or
      requires a separate backfill job?
- [ ] Backfill performance: row count, estimated duration, whether it
      needs to run in batches to avoid locking the table under load

### Reversibility
- [ ] Is this migration cleanly reversible (e.g., DROP COLUMN on a new
      nullable column) or does reversal require its own careful
      migration (e.g., after a column drop, or a data transformation
      that isn't 1:1 invertible)?
- [ ] If not cleanly reversible: what's the actual rollback procedure?

### Application Coordination
- [ ] Does the application code need to deploy before, after, or
      simultaneously with this migration? (Expand-contract pattern for
      zero-downtime changes usually means: expand first, deploy app
      code that handles both old and new schema, THEN contract)

The Expand-Contract Pattern, as a Spec-Level Concern

flowchart LR
    A[Expand: add new column/table, nullable, unused] --> B[Deploy app code that writes to both old and new]
    B --> C[Backfill existing data]
    C --> D[Deploy app code that reads from new, stops writing old]
    D --> E[Contract: drop old column/table]

For any migration affecting a column or table actively used in production, specifying the full expand-contract sequence — not just the final schema state — is what actually determines whether the migration can happen without downtime. A spec that only describes the target schema, without the staged sequence to get there safely, leaves the riskiest part (the actual rollout coordination between schema and application code) unspecified.

Backfill Performance Deserves Explicit Attention

A backfill that looks trivial in a spec (“populate the new column from existing data”) can be a multi-hour, table-locking operation on a large production table if it’s not batched. Specifying batch size, expected duration, and whether it runs online (without blocking normal traffic) or requires a maintenance window is the difference between a migration spec that’s actually actionable and one that looks complete but hides a production incident in the “backfill” bullet point.

Treat the Migration Spec as Part of the Feature Spec, Not Separate

A feature spec that requires a schema change should reference its migration spec directly, with the migration’s rollout stages accounted for in the feature’s own rollout plan — a feature can’t safely ship ahead of the schema change it depends on, and specifying them independently risks a sequencing mismatch that only surfaces at deploy time.

Key Takeaways

  1. Database migrations are among the least reversible changes in most codebases — this deserves its own explicit spec discipline
  2. Specify the backfill strategy and its performance characteristics explicitly — a trivial-looking backfill can be a production incident
  3. For zero-downtime changes, specify the full expand-contract sequence, not just the target schema state
  4. Reference the migration spec from the feature spec that depends on it — sequencing them independently risks a mismatch at deploy time

Part of the Spec-Driven Development series — how agentic coding goes from vibe-coded prototypes to production-grade systems.